Lindapter Type AAF clamps and Grate-Fast fixings enabled fast, weld-free installation of baggage-handling conveyor supports and mezzanine walkway grating at JFK Terminal 1.
Location: New York, USA
Market: Airports/Transportation Infrastructure
Product: Type AAF & Grate-Fast® by Lindapter®
Quantity: 8400
Client: JFK Airport
Engineer/Specifier: Arambol (Spain)
Contractor: Vanderlande
Steel Fabricator: J&J
As part of ongoing infrastructure upgrades at JFK Airport Terminal 1, a new baggage-handling system was installed to improve operational efficiency and passenger throughput. The project involved elevated conveyor structures and mezzanine walkways within an active airport environment, where construction time, safety and coordination were critical. Any connection solution had to integrate seamlessly with the steel framework while minimising disruption to airport operations.
The client required a reliable and efficient method for fixing structural steel components associated with the baggage-handling conveyors and walkways. Connections needed to accommodate varying beam sizes, support dynamic operational loads, and allow installation without drilling or welding, particularly important in a live terminal environment. Speed of installation, reduced labour, and compatibility with subsequent fireproofing works were also key considerations.
Lindapter Type AAF clamps were specified to fasten the primary frames and bracing for the elevated baggage-handling conveyors, providing secure, adjustable connections across beam widths ranging from 15cm to 25cm using an M16 support bracket assembly. In parallel, Lindapter Grate-Fast fixings were selected to secure the steel grating to mezzanine walkways, offering a quick method of installation without the need for welding or secondary drilling. Together, these systems delivered a fully engineered, high-performance solution suited to the operational demands of airport infrastructure.
Type AAF clamps were used throughout the baggage-handling system to connect steel frames and bracing that support the elevated conveyor lines. Grate-Fast was applied to fix the grating panels to the mezzanine walkways, ensuring safe access for maintenance personnel while maintaining a clean and consistent finish. Installation was carried out efficiently within the constraints of an operational airport. The clamp-based connection systems eliminated the need for hot works, enabling faster progress and reducing health and safety risks on-site. Following installation of the steelwork, fireproofing was applied including over the top of the Lindapter fixings systems to meet regulatory requirements.
The project was completed with a robust, adaptable and time-efficient connection solution that supported critical baggage-handling operations. Lindapter’s clamping and grating fixings helped reduce installation time, simplify coordination between trades, and maintain safety standards within a live airport environment.
Want to find out more about this product?
Watch the
installation video
How can we
help you?
Reasons to choose Lindapter
Save time and money
Clamping two steel sections together avoids time-consuming welding or conventional drilling and bolting.
Safer connections
On-site drilling and welding is avoided, removing the need for hot work permits and encouraging safer site conditions.
High strength
Lindapter clamps are manufactured from high strength materials to resist high load requirements and harsh environments.
Industry leading approvals
Lindapter has earned a reputation synonymous with safety and reliability, gaining multiple independent approvals.
Adjustable
Quickly align steel sections by sliding the section into the correct position before tightening the Girder Clamp to complete the installation.
Free connection design
Lindapter’s experienced Engineers can design a bespoke connection based on your specific requirements free of charge.
You must have a Lindapter account to access this content
Log in to your account
Register for an account
Don't have an account?
Click here to registerAlready registered?
If you have registered for an account but have not received your confirmation email, please click here to resend.
Headquarters
Lindapter Internationalnews