About
Contact
News
My Lindapter
Home
Products
by Group
Steelwork Fixings
Cavity Fixings
Decking Fixings
Support Fixings
Floor Fixings
Rail Fixings
by Assembly
Selector
View all...
Markets
Structural Engineering
Civil Engineering
Oil & Gas
Rail
Architectural
Building Services
Resources
Downloads
Installation Cards
2D Drawings
3D Drawings
Approvals
Component pages
Map and Directions
Market Brochures
Catalogues
CPD Pack
3d pdf
Environmental Policy
Project Portfolio
Login
Register
Links
Case Studies
go>
English
French
German
You are here:
Home
>
News
Products
Markets
Steelwork Fixings
Cavity Fixings
Decking Fixings
Support Fixings
Floor Fixings
Rail Fixings
>
Structural Engineering
>
Civil Engineering
>
Oil & Gas
>
Rail
>
Architectural
>
Building Services
Latest News
Exhibition News
Lindapter Secures Target Field Canopy
Architectural Concept Becomes a Reality
Type MF Decking Fixing
New Design Guide
Minimalistic Hollo-Bolt®
75 years of Lindapter
Lindapter Unleash The Claw
Lindapter’s Royal Interest
Lindapter's Digital Vision
Lindapter Secures Target Field Canopy
01/04/2010 11:18:30
The $425 million Target Field ballpark features an inspiring 1,988 ton steel sunshade canopy that sweeps around the stadium, with a 7,432 m² glistening soffit safely suspended overhead with Lindapter steelwork fixings.
(Click image to enlarge)
Courtesy of Wayne Kryduba, Minnesota Twins.
The 40,000 seat, open-air Target Field is the new home of Minnesota Twins, an American professional baseball team based in Minneapolis, Minnesota. The architecturally stunning curved canopy presented a challenge to the connection design due to the connecting beams varying in size and angle throughout. The engineers also had to meet a vital criterion of accommodating up to 22.3kN of wind load, while the contractor favoured a simple to install, universal connection that could be used on both primary and secondary steel sections.
Lindapter provided a single solution that exceeded these requirements with the Type LR Girder Clamp (M20) connection system, independently approved to a safe working load of 58.8kN at a 5:1 factor of safety. The self-adjustable assembly is compatible with flange thicknesses of 3 to 20mm, while an over-sized slotted location plate enabled the simple adjustment to fit variations in beam width and connection angle. The efficient connection allowed the canopy risers to be easily aligned into position, allowing a faster installation in comparison to more time consuming conventional methods such as drilling, or repeated tack welding and grinding, thereby reducing on-site costs.
As the installation did not require hot working it was not necessary to renew the corrosion protection at over 1,200 connection points and more importantly, the structural integrity of the primary steel was maintained. As the canopy construction largely consisted of elevated and overhead work, eliminating drilling, welding and grinding contributed greatly to the overall safety of the project.
For further product information please
click here
TEXT SIZE:
A
/
A
/
A