About
Contact
News
My Lindapter
Home
Products
by Group
Girder Clamp
Hollo-Bolt & Lindibolt
Decking Fixings
Support Fixings
Floor Fixings
Rail Fixings
Lifting Points
by Assembly
Selector
View all...
Markets
Structural Engineering
Civil Engineering
Oil & Gas
Rail
Architectural
Materials Handling
Building Services
Resources
Downloads
Installation Cards
2D Drawings
3D Drawings
Approvals
Component pages
Map and Directions
Market Brochures
Catalogues
CPD Flyer and Agenda
3d Assembly pdfs
Environmental Policy
Market Focus Leaflets
Product Brochures
Supplier Code of Conduct
Login
Register
Product Videos
Case Studies
go>
English
French
German
You are here:
Home
>
News
Products
Markets
Girder Clamp
Hollo-Bolt & Lindibolt
Decking Fixings
Support Fixings
Floor Fixings
Rail Fixings
Lifting Points
>
Structural Engineering
>
Civil Engineering
>
Oil & Gas
>
Rail
>
Architectural
>
Materials Handling
>
Building Services
Latest News
Brexit Statement
Live Webinar Schedule 2021
New Product Launch - Type COM Decking Fixing
Update Regarding Covid-19
New Case Study - Bavaria Towers
Hollo-Bolt® | Blind Bolt | Blind Fastener
New Staff Update
New Case Study - Lidl Headquarters
New Case Study - Bahrain Airport
New Case Study - CitizenM Hotel
New Product Catalogue 2019 Edition
Type CF Product Range Extension
New CPD Seminar for Structural Engineers
New Product Launch - AMD Decking Fixing
Lindapter Clamps Provided a Quick Installation
Lindapter Type F9 Clamps Were Used for a Modular School
Girder Clamp Solution Avoided Costly Lead Abatement
Type LR Clamps were used to Secure the Bridge Walkway
Lindapter's Adjustable Fixings for Off-Site Construction
New brochure for Modular & Offsite Construction
Connections for Modular Construction
The Facade Contractor Halved the Time of Installation
Hollo-Bolt used at Toulouse-Blagnac Airport
Protecting Lindapter’s Intellectual Property
Lindapter Launches its Guide to Sustainable Construction
Huge Success at Infrarail
Lindapter's Extended Product Range is Now CE Approved
Grate-Fast Secured Walkway on Iconic Bridge
Lindapter's Hollo-Bolt was Specified for Falkenberg Castle
Lindapter Helped the Contractor to Win Shell Contracts
Hollo-Bolt was Specified due to Wind Load Capacities
Continued Growth at Lindapter Leads to an Expansion
Lindapter Launch Offshore and Subsea Booklet
Lindapter Launches its Guide to a Faster Rail Installation
Large Pipes Suspended by Lindapter Steel Fixings
Circular Building Demonstrates Sustainable Construction
Seismic Approved Hollo-Bolt Specified for LA Skyscraper
Lindapter Launch Arts and Entertainment Booklet
Hollo-Bolt was Used to Secure Balcony Extensions
Type AF Clamp was Specified for Subsea Tidal Turbine
Lindapter's Type HD Clips Used at New Hitachi Facility
Lindapter Specified for Eiffel Tower Projects
Hollo-Bolt Flush Fit was Used for Securing a Factory Floor
Hollo-Bolt was Specified due to Wind Load Capacities
Girder Clamp Secures 'World Leading Tourist Attraction'
Steel Contractor Doubles Speed of Construction
Type AAF Clamp Specified for Sky-Pool Structure
Lindapter Specified for Railway Platform Project
Hollo-Bolt used for Kings Crescent Retrofit Balconies
Hollo-Bolt Specified for 8-Story Facade Sculpture
Brexit Statement
17/12/2020 14:09:16
January 2021 Update
As a leading British manufacturer that operates internationally, employing teams in multiple countries and exporting products worldwide, Lindapter prepared extensively for the United Kingdom’s departure from the European Union. Since the ‘Brexit’ referendum on 23 June 2016, Lindapter’s preparations were carefully planned and proactive measures implemented in advance of the Brexit Transition Period, which ended on 31 December 2020.
Lindapter has invested substantial resources to ensure both the continued manufacturing of its entire product portfolio and the continued product availability throughout the world (including within the European Economic Area). A range of initiatives included increased inventory, enhanced supply chain contingency plans and new logistical procedures. Lindapter is registered for the Trader Support Service and its EORI numbers are:
• GB939555476000 to move goods between Great Britain and the EU
• XI939555476000 to move goods between Great Britain and NI
Additionally, Lindapter undertook a significant commitment to ensure the continued CE Mark certification of its products. As part of this process, Lindapter transferred its European Technical Assessments (ETAs) to a Technical Assessment Body (TAB) based in the EU. Further information and the latest CE Mark documents can be viewed at:
www.lindapter.com/about/ce