About
Contact
News
My Lindapter
Home
Products
by Group
Steelwork Fixings
Cavity Fixings
Decking Fixings
Support Fixings
Floor Fixings
Rail Fixings
by Assembly
Selector
View all...
Markets
Structural Engineering
Civil Engineering
Oil & Gas
Rail
Architectural
Building Services
Resources
Downloads
Installation Cards
2D Drawings
3D Drawings
Approvals
Component pages
Map and Directions
Market Brochures
Catalogues
CPD Pack
3d pdf
Environmental Policy
Project Portfolio
Login
Register
Links
Case Studies
go>
English
French
German
You are here:
Home
>
News
Products
Markets
Steelwork Fixings
Cavity Fixings
Decking Fixings
Support Fixings
Floor Fixings
Rail Fixings
>
Structural Engineering
>
Civil Engineering
>
Oil & Gas
>
Rail
>
Architectural
>
Building Services
Latest News
Exhibition News
Lindapter Secures Target Field Canopy
Architectural Concept Becomes a Reality
Type MF Decking Fixing
New Design Guide
Minimalistic Hollo-Bolt®
75 years of Lindapter
Lindapter Unleash The Claw
Lindapter’s Royal Interest
Lindapter's Digital Vision
75 years of Lindapter
06/05/2009 13:23:19
In light of the current economic climate it makes refreshing news to learn of a company that has endured a number of recessions since the brand’s inception in 1934 and remains steadfast in the face of the latest industrial downturn.
(Click image to enlarge)
Lindapter celebrates 75 years pioneering the design and manufacture of steelwork connection solutions; following a legacy set by founder Henry Lindsay to produce only the highest quality steelwork fixings. Lindapter provides a unique and proven concept – innovative steelwork clamping systems that eliminate the need to drill or weld steelwork, enabling rapid construction and low labour costs.
The vast product range has diversified from the original 1934 invention of the malleable iron hook-bolt adapter, or ‘Lindsay Adaptor’ and the combination of the two words explains the formation of the now famous brand name. Today the distinguished array of products includes steelwork, cavity, decking, support and floor fixings, in addition to bespoke product development. A policy of continuous investment in R&D has allowed Lindapter to remain dynamic and adjust to new markets through product extension. Lindapter firmly believes that by adopting a proactive approach, particularly in seeking business overseas, UK businesses can remain profitable during these troubled times.
Lindapter has manufactured to the highest standard for three quarters of a century, earning a multitude of independent approvals and a reputation synonymous with safety and reliability. Current accreditations awarded by international associations include Lloyds Register, TÜV NORD, Deutsches Institut für Bautechnik and Det Norske Veritas. Lindapter is specified on countless projects across the globe from the Antarctic to the Caribbean, in diverse applications as varied as the London Tower Bridge, Target Field Ballpark, Dubai Shopping Mall, Saudi Kayan Industrial Complex and Gautrain Rapid Rail Link.
TEXT SIZE:
A
/
A
/
A